Foundation Work

955_foundation_1

The foundation work has been underway this week and will be done by the end of the week. Block work started on Monday, insulation work was yesterday, and, weather permitting, they should be wrapping up the remainder of the work by the end of this work. Guess what this means?? Yep! The house will be delivered and set next week. We are quickly going to go from nothing to a two story structure in a matter of days. Ah…the beauty of prefab.

955_foundation_2

955_foundation_3

As you can see, we opted for a crawl space on this house. This was partially driven by economics and also by the prefab process. When working with prefab homes, you have to go with either a crawl space or a basement, as a slab-on-grade simply won’t work. This is because of the way prefab homes are manufactured. In order to build walls (both interior and exterior), you need a floor structure on which to build them in the factory. This necessitates building the floor structure in the factory. As a result, a slab-on-grade simply would not work.

We will wait to do any concrete pours (the garage, garage apron, front porch, sidewalk) until after the house gets set. By the end of next week, the site is going to look dramatically different. Keep your eyes open and look for the crane mid week next week!

 

 

Advertisements